Development of drilling non-productive time reduction framework using lean six sigma methodology for buntal exploration wells
Drilling Non-Productive Time (NPT) is loss time incurred when drilling activity has to be stopped or rate of penetration is very low during a drilling operation. Drilling NPT results in drilling cost overruns and delay in drilling schedule. Presently, there are several methods which are being deploy...
Saved in:
Main Author: | Munusamy, Balasharmila Rao |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2023
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/101745/1/BalasharmilaRaoMunusamySCShE2023.pdf.pdf http://eprints.utm.my/id/eprint/101745/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:152259 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Cycle time reduction using lean six sigma in make-to-order (MTO) environment: Conceptual framework
by: Man, Siti Mariam, et al.
Published: (2015) -
The fundamental concept of integrates lean six sigma and DMADV methodologies.
by: Hanoosh, Jalal Anees Abdulkhudhur, et al.
Published: (2023) -
Lean six sigma sustainability factors
by: Tan, Su Yong
Published: (2016) -
Scraps management with lean six sigma
by: Choong, Kei Shing, et al.
Published: (2014) -
The application of Green Lean Six Sigma
by: Gholami, Hamed, et al.
Published: (2021)