Development of drilling non-productive time reduction framework using lean six sigma methodology for buntal exploration wells
Drilling Non-Productive Time (NPT) is loss time incurred when drilling activity has to be stopped or rate of penetration is very low during a drilling operation. Drilling NPT results in drilling cost overruns and delay in drilling schedule. Presently, there are several methods which are being deploy...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2023
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/101745/1/BalasharmilaRaoMunusamySCShE2023.pdf.pdf http://eprints.utm.my/id/eprint/101745/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:152259 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|