Development of drilling non-productive time reduction framework using lean six sigma methodology for buntal exploration wells

Drilling Non-Productive Time (NPT) is loss time incurred when drilling activity has to be stopped or rate of penetration is very low during a drilling operation. Drilling NPT results in drilling cost overruns and delay in drilling schedule. Presently, there are several methods which are being deploy...

Full description

Saved in:
Bibliographic Details
Main Author: Munusamy, Balasharmila Rao
Format: Thesis
Language:English
Published: 2023
Subjects:
Online Access:http://eprints.utm.my/id/eprint/101745/1/BalasharmilaRaoMunusamySCShE2023.pdf.pdf
http://eprints.utm.my/id/eprint/101745/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:152259
Tags: Add Tag
No Tags, Be the first to tag this record!