Productivity study and line balancing of GGMG & CALICO production line

Assembly line balancing is assumed to have fixed task within specified task time during the initial stage of the mass production. The problem of current case study of this assembly line was the production line cannot meet the expected output plan with imbalance station cycle time. In this paper, pro...

Full description

Saved in:
Bibliographic Details
Main Authors: Hartini, Mustafa, A. R., Yusoff, M. Yusoff, Ismail
Format: Article
Language:English
Published: Trans Tech Publications, Switzerland 2012
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/26998/1/Productivity%20study%20and%20line%20balancing%20of%20GGMG%20%26%20CALICO%20production%20line.pdf
http://umpir.ump.edu.my/id/eprint/26998/
https://doi.org/10.4028/www.scientific.net/AMR.576.700
https://doi.org/10.4028/www.scientific.net/AMR.576.700
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first