Productivity study and line balancing of GGMG & CALICO production line
Assembly line balancing is assumed to have fixed task within specified task time during the initial stage of the mass production. The problem of current case study of this assembly line was the production line cannot meet the expected output plan with imbalance station cycle time. In this paper, pro...
Saved in:
Main Authors: | , , |
---|---|
格式: | Article |
語言: | English |
出版: |
Trans Tech Publications, Switzerland
2012
|
主題: | |
在線閱讀: | http://umpir.ump.edu.my/id/eprint/26998/1/Productivity%20study%20and%20line%20balancing%20of%20GGMG%20%26%20CALICO%20production%20line.pdf http://umpir.ump.edu.my/id/eprint/26998/ https://doi.org/10.4028/www.scientific.net/AMR.576.700 https://doi.org/10.4028/www.scientific.net/AMR.576.700 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|