Productivity study and line balancing of GGMG & CALICO production line
Assembly line balancing is assumed to have fixed task within specified task time during the initial stage of the mass production. The problem of current case study of this assembly line was the production line cannot meet the expected output plan with imbalance station cycle time. In this paper, pro...
Saved in:
Main Authors: | , , |
---|---|
格式: | Article |
語言: | English |
出版: |
Trans Tech Publications, Switzerland
2012
|
主題: | |
在線閱讀: | http://umpir.ump.edu.my/id/eprint/26998/1/Productivity%20study%20and%20line%20balancing%20of%20GGMG%20%26%20CALICO%20production%20line.pdf http://umpir.ump.edu.my/id/eprint/26998/ https://doi.org/10.4028/www.scientific.net/AMR.576.700 https://doi.org/10.4028/www.scientific.net/AMR.576.700 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
id |
my.ump.umpir.26998 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.269982020-03-22T23:48:37Z http://umpir.ump.edu.my/id/eprint/26998/ Productivity study and line balancing of GGMG & CALICO production line Hartini, Mustafa A. R., Yusoff M. Yusoff, Ismail TS Manufactures Assembly line balancing is assumed to have fixed task within specified task time during the initial stage of the mass production. The problem of current case study of this assembly line was the production line cannot meet the expected output plan with imbalance station cycle time. In this paper, productivity study and line balancing is applied to improve production line of GGMG & CALICO. The desired cycle time defined using the Standard Time Data (STD) which required the person to perform assign task till completion by defining the performance rating of person. The proposed solution proved by the implementation analysis conducted in the research. The results showed that the productivity of production line which is tremendously increased within 50% after implementation. There are six factors identified during the study which are bottleneck stations, workpiece flow, line layout, ergonomic, resource assignment and buffer allocation. Trans Tech Publications, Switzerland 2012 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/26998/1/Productivity%20study%20and%20line%20balancing%20of%20GGMG%20%26%20CALICO%20production%20line.pdf Hartini, Mustafa and A. R., Yusoff and M. Yusoff, Ismail (2012) Productivity study and line balancing of GGMG & CALICO production line. Advanced Materials Research, 576. pp. 700-704. ISSN 1022-6680 (print), 1662-8985 (online). (Published) https://doi.org/10.4028/www.scientific.net/AMR.576.700 https://doi.org/10.4028/www.scientific.net/AMR.576.700 |
institution |
Universiti Malaysia Pahang Al-Sultan Abdullah |
building |
UMPSA Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang Al-Sultan Abdullah |
content_source |
UMPSA Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
TS Manufactures |
spellingShingle |
TS Manufactures Hartini, Mustafa A. R., Yusoff M. Yusoff, Ismail Productivity study and line balancing of GGMG & CALICO production line |
description |
Assembly line balancing is assumed to have fixed task within specified task time during the initial stage of the mass production. The problem of current case study of this assembly line was the production line cannot meet the expected output plan with imbalance station cycle time. In this paper, productivity study and line balancing is applied to improve production line of GGMG & CALICO. The desired cycle time defined using the Standard Time Data (STD) which required the person to perform assign task till completion by defining the performance rating of person. The proposed solution proved by the implementation analysis conducted in the research. The results showed that the productivity of production line which is tremendously increased within 50% after implementation. There are six factors identified during the study which are bottleneck stations, workpiece flow, line layout, ergonomic, resource assignment and buffer allocation. |
format |
Article |
author |
Hartini, Mustafa A. R., Yusoff M. Yusoff, Ismail |
author_facet |
Hartini, Mustafa A. R., Yusoff M. Yusoff, Ismail |
author_sort |
Hartini, Mustafa |
title |
Productivity study and line balancing of GGMG & CALICO production line |
title_short |
Productivity study and line balancing of GGMG & CALICO production line |
title_full |
Productivity study and line balancing of GGMG & CALICO production line |
title_fullStr |
Productivity study and line balancing of GGMG & CALICO production line |
title_full_unstemmed |
Productivity study and line balancing of GGMG & CALICO production line |
title_sort |
productivity study and line balancing of ggmg & calico production line |
publisher |
Trans Tech Publications, Switzerland |
publishDate |
2012 |
url |
http://umpir.ump.edu.my/id/eprint/26998/1/Productivity%20study%20and%20line%20balancing%20of%20GGMG%20%26%20CALICO%20production%20line.pdf http://umpir.ump.edu.my/id/eprint/26998/ https://doi.org/10.4028/www.scientific.net/AMR.576.700 https://doi.org/10.4028/www.scientific.net/AMR.576.700 |
_version_ |
1822921224171290624 |
score |
13.250246 |