Productivity study and line balancing of GGMG & CALICO production line

Assembly line balancing is assumed to have fixed task within specified task time during the initial stage of the mass production. The problem of current case study of this assembly line was the production line cannot meet the expected output plan with imbalance station cycle time. In this paper, pro...

全面介绍

Saved in:
书目详细资料
Main Authors: Hartini, Mustafa, A. R., Yusoff, M. Yusoff, Ismail
格式: Article
语言:English
出版: Trans Tech Publications, Switzerland 2012
主题:
在线阅读:http://umpir.ump.edu.my/id/eprint/26998/1/Productivity%20study%20and%20line%20balancing%20of%20GGMG%20%26%20CALICO%20production%20line.pdf
http://umpir.ump.edu.my/id/eprint/26998/
https://doi.org/10.4028/www.scientific.net/AMR.576.700
https://doi.org/10.4028/www.scientific.net/AMR.576.700
标签: 添加标签
没有标签, 成为第一个标记此记录!
实物特征
总结:Assembly line balancing is assumed to have fixed task within specified task time during the initial stage of the mass production. The problem of current case study of this assembly line was the production line cannot meet the expected output plan with imbalance station cycle time. In this paper, productivity study and line balancing is applied to improve production line of GGMG & CALICO. The desired cycle time defined using the Standard Time Data (STD) which required the person to perform assign task till completion by defining the performance rating of person. The proposed solution proved by the implementation analysis conducted in the research. The results showed that the productivity of production line which is tremendously increased within 50% after implementation. There are six factors identified during the study which are bottleneck stations, workpiece flow, line layout, ergonomic, resource assignment and buffer allocation.