Optimization of Simultaneous Scheduling for Machines and Automated Guided Vehicles Using Fuzzy Genetic Algorithm

Flexible manufacturing system (FMS) has been introduced by the researchers as an integrated manufacturing environment. Automated guided vehicles (AGVs) introduced as the main tool of material handling systems in FMS. While the scheduling of AGVs and machines are highly related; simultaneous sched...

Full description

Saved in:
Bibliographic Details
Main Author: Badakhshian, Mostafa
Format: Thesis
Language:English
English
Published: 2009
Online Access:http://psasir.upm.edu.my/id/eprint/7354/1/FK_2009_45a.pdf
http://psasir.upm.edu.my/id/eprint/7354/
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first