Optimization of Simultaneous Scheduling for Machines and Automated Guided Vehicles Using Fuzzy Genetic Algorithm
Flexible manufacturing system (FMS) has been introduced by the researchers as an integrated manufacturing environment. Automated guided vehicles (AGVs) introduced as the main tool of material handling systems in FMS. While the scheduling of AGVs and machines are highly related; simultaneous sched...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2009
|
Online Access: | http://psasir.upm.edu.my/id/eprint/7354/1/FK_2009_45a.pdf http://psasir.upm.edu.my/id/eprint/7354/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|