Optimization of Simultaneous Scheduling for Machines and Automated Guided Vehicles Using Fuzzy Genetic Algorithm
Flexible manufacturing system (FMS) has been introduced by the researchers as an integrated manufacturing environment. Automated guided vehicles (AGVs) introduced as the main tool of material handling systems in FMS. While the scheduling of AGVs and machines are highly related; simultaneous sched...
Saved in:
Main Author: | Badakhshian, Mostafa |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2009
|
Online Access: | http://psasir.upm.edu.my/id/eprint/7354/1/FK_2009_45a.pdf http://psasir.upm.edu.my/id/eprint/7354/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Performance optimization of simultaneous machine and automated guided vehicle scheduling using fuzzy logic controller based genetic algorithm.
by: Sulaiman, Shamsuddin, et al.
Published: (2012) -
Using simulated annealing algorithm for optimization of quay cranes and automated guided vehicles scheduling
by: Homayouni, Seyed Mahdi, et al.
Published: (2011) -
A hybrid genetic-heuristic algorithm for scheduling of automated guided vehicles and quay cranes in automated container terminals
by: Homayouni, Seyed Mahdi, et al.
Published: (2009) -
Makespan Minimization of Machines and Automated Guided Vehicles Schedule Using Binary Particle Swarm Optimization
by: Md Fauadi, Muhammad Hafidz Fazli, et al.
Published: (2010) -
Hybrid multiobjective genetic algorithm for integrated dynamic scheduling and routing of jobs and automated guided vehicles in flexible manufacturing systems
by: Umar, Umar Ali
Published: (2014)