Assessment the unused capacity using time driven activity based costing in automotive manufacturing industry
Automotive Manufacturing Industry usually known implementing all six sigma method and lean manufacturing. However, actual practicality in the world of manufacturing, there are a lot of factors contributes that become the challenge to the ideal of lean production line. Not exclude those factors, ther...
Saved in:
Main Authors: | N. F. A., Ghani, S. N. A. M., Zaini, Mohd Yazid, Abu |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UMP
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/28189/7/Assessment%20the%20unused%20capacity%20using%20time%20driven%20activity.pdf http://umpir.ump.edu.my/id/eprint/28189/ https://doi.org/10.15282/jmmst.v4i1.3839 https://doi.org/10.15282/jmmst.v4i1.3839 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Implementing time-driven activity-based costing for unused capacity measurement in local university
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2023) -
Measuring the Unused Capacity for Mature and Immature Area in Palm Oil Nursery Using Time Driven Activity-Based Costing
by: S. N. A. M., Zaini, et al.
Published: (2021) -
A case study on the determination of unused capacity using time driven activity-based costing for electronic component
by: N. F., Zamrud, et al.
Published: (2020) -
A case study on the un-used capacity assessment using time driven activity based costing for magnetic components
by: Areena, Zaini, et al.
Published: (2020) -
The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
by: Nurul Farahin, Zamrud, et al.
Published: (2020)