Assessment the unused capacity using time driven activity based costing in automotive manufacturing industry
Automotive Manufacturing Industry usually known implementing all six sigma method and lean manufacturing. However, actual practicality in the world of manufacturing, there are a lot of factors contributes that become the challenge to the ideal of lean production line. Not exclude those factors, ther...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UMP
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/28189/7/Assessment%20the%20unused%20capacity%20using%20time%20driven%20activity.pdf http://umpir.ump.edu.my/id/eprint/28189/ https://doi.org/10.15282/jmmst.v4i1.3839 https://doi.org/10.15282/jmmst.v4i1.3839 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|