A case study on the un-used capacity assessment using time driven activity based costing for magnetic components

The Electrical & Electronic (E&E) company is one of Malaysia’s leading industries that has 24.5% in manufacturing sector production. With a continuous innovation of E&E company, the current costing being used is hardly to access the complete activities with variations required for each w...

Full description

Saved in:
Bibliographic Details
Main Authors: Areena, Zaini, Haryantie, Kamil, Mohd Yazid, Abu
Format: Article
Language:English
Published: Penerbit Universiti Malaysia Pahang 2020
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/29796/7/A%20case%20study%20on%20the%20un-used%20capacity.pdf
http://umpir.ump.edu.my/id/eprint/29796/
https://doi.org/10.15282/ijim.6.1.2020.5410
https://doi.org/10.15282/ijim.6.1.2020.5410
Tags: Add Tag
No Tags, Be the first to tag this record!