Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]
A schedule delay occurs when there is an event or condition that delays the project's commencement or progress. In this case, the completion and delivery of construction projects are deemed ineffective if they fail to satisfy the predetermined criteria, budget, schedule, and stakeholder expecta...
Saved in:
Main Authors: | Sharuddin, Nurul Mahirah, Azman, Mohd Azrai, Abdul Samad, Zulkiflee, Mohd Rodzi, Rodziana |
---|---|
Format: | Article |
Language: | English |
Published: |
UiTM Press
2024
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/109930/1/109930.pdf https://ir.uitm.edu.my/id/eprint/109930/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Domestic water quality monitoring at Seberang Perai Tengah, Pulau Pinang / Siti Rohany Sharuddin
by: Sharuddin, Siti Rohany
Published: (2006) -
An analysis of video streaming using VLC media player / Nurliyana Sharuddin
by: Sharuddin, Nurliyana
Published: (2011) -
Hybrid art features in Malaysia’s printmaking / Mahirah Zakaria
by: Zakaria, Mahirah
Published: (2019) -
Watermelon rind and blackpepper crude extraction as corrosion inhibitoron mild steel / Muhammad Taqiuddin Sharuddin
by: Sharuddin, Muhammad Taqiuddin
Published: (2016) -
Detection of mature and immature oil palm from image Sentinel-2 using Google Earth Engine (GEE) / Nurul Ain Nabilah Sharuddin
by: Sharuddin, Nurul Ain Nabilah
Published: (2022)