Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]
A schedule delay occurs when there is an event or condition that delays the project's commencement or progress. In this case, the completion and delivery of construction projects are deemed ineffective if they fail to satisfy the predetermined criteria, budget, schedule, and stakeholder expecta...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
UiTM Press
2024
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/109930/1/109930.pdf https://ir.uitm.edu.my/id/eprint/109930/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.109930 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.1099302025-02-09T17:28:02Z https://ir.uitm.edu.my/id/eprint/109930/ Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.] bej Sharuddin, Nurul Mahirah Azman, Mohd Azrai Abdul Samad, Zulkiflee Mohd Rodzi, Rodziana TA Engineering. Civil engineering A schedule delay occurs when there is an event or condition that delays the project's commencement or progress. In this case, the completion and delivery of construction projects are deemed ineffective if they fail to satisfy the predetermined criteria, budget, schedule, and stakeholder expectations. As a result, early detection of delays is critical to minimizing their impact on construction project performance. Consequently, this research aims to investigate the relationship between schedule delay factors and project performance in civil engineering works. To achieve this, the contributing factors of schedule delays, the effects of schedule delays and ways that can be taken to overcome schedule delays were identified using questionnaire surveys. The surveys were distributed to G7 civil engineering contractors and 144 were returned. Then, the data collected were analysed using descriptive statistics, Cronbach’s alpha and Kruskal-Wallis test statistics. Based on the research, the study reveals that weakness in the operational system, contractors’ lack of capability in terms of finances and lack of experience of the contractor are the major factors resulting in the delayed completion of civil engineering projects. The findings of the study are intended to offer those involved in civil construction projects appropriate solutions for countering schedule delays. UiTM Press 2024-09 Article PeerReviewed text en https://ir.uitm.edu.my/id/eprint/109930/1/109930.pdf Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]. (2024) Built Environment Journal <https://ir.uitm.edu.my/view/publication/Built_Environment_Journal/>, 21: 3. pp. 23-36. ISSN 2637-0395 |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
TA Engineering. Civil engineering |
spellingShingle |
TA Engineering. Civil engineering Sharuddin, Nurul Mahirah Azman, Mohd Azrai Abdul Samad, Zulkiflee Mohd Rodzi, Rodziana Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.] |
description |
A schedule delay occurs when there is an event or condition that delays the project's commencement or progress. In this case, the completion and delivery of construction projects are deemed ineffective if they fail to satisfy the predetermined criteria, budget, schedule, and stakeholder expectations. As a result, early detection of delays is critical to minimizing their impact on construction project performance. Consequently, this research aims to investigate the relationship between schedule delay factors and project performance in civil engineering works. To achieve this, the contributing factors of schedule delays, the effects of schedule delays and ways that can be taken to overcome schedule delays were identified using questionnaire surveys. The surveys were distributed to G7 civil engineering contractors and 144 were returned. Then, the data collected were analysed using descriptive statistics, Cronbach’s alpha and Kruskal-Wallis test statistics. Based on the research, the study reveals that weakness in the operational system, contractors’ lack of capability in terms of finances and lack of experience of the contractor are the major factors resulting in the delayed completion of civil engineering projects. The findings of the study are intended to offer those involved in civil construction projects appropriate solutions for countering schedule delays. |
format |
Article |
author |
Sharuddin, Nurul Mahirah Azman, Mohd Azrai Abdul Samad, Zulkiflee Mohd Rodzi, Rodziana |
author_facet |
Sharuddin, Nurul Mahirah Azman, Mohd Azrai Abdul Samad, Zulkiflee Mohd Rodzi, Rodziana |
author_sort |
Sharuddin, Nurul Mahirah |
title |
Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.] |
title_short |
Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.] |
title_full |
Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.] |
title_fullStr |
Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.] |
title_full_unstemmed |
Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.] |
title_sort |
relationship between schedule delay factors and project performance in civil engineering works / nurul mahirah sharuddin ... [et al.] |
publisher |
UiTM Press |
publishDate |
2024 |
url |
https://ir.uitm.edu.my/id/eprint/109930/1/109930.pdf https://ir.uitm.edu.my/id/eprint/109930/ |
_version_ |
1825165134024146944 |
score |
13.239859 |