Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]

A schedule delay occurs when there is an event or condition that delays the project's commencement or progress. In this case, the completion and delivery of construction projects are deemed ineffective if they fail to satisfy the predetermined criteria, budget, schedule, and stakeholder expecta...

Full description

Saved in:
Bibliographic Details
Main Authors: Sharuddin, Nurul Mahirah, Azman, Mohd Azrai, Abdul Samad, Zulkiflee, Mohd Rodzi, Rodziana
Format: Article
Language:English
Published: UiTM Press 2024
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/109930/1/109930.pdf
https://ir.uitm.edu.my/id/eprint/109930/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.109930
record_format eprints
spelling my.uitm.ir.1099302025-02-09T17:28:02Z https://ir.uitm.edu.my/id/eprint/109930/ Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.] bej Sharuddin, Nurul Mahirah Azman, Mohd Azrai Abdul Samad, Zulkiflee Mohd Rodzi, Rodziana TA Engineering. Civil engineering A schedule delay occurs when there is an event or condition that delays the project's commencement or progress. In this case, the completion and delivery of construction projects are deemed ineffective if they fail to satisfy the predetermined criteria, budget, schedule, and stakeholder expectations. As a result, early detection of delays is critical to minimizing their impact on construction project performance. Consequently, this research aims to investigate the relationship between schedule delay factors and project performance in civil engineering works. To achieve this, the contributing factors of schedule delays, the effects of schedule delays and ways that can be taken to overcome schedule delays were identified using questionnaire surveys. The surveys were distributed to G7 civil engineering contractors and 144 were returned. Then, the data collected were analysed using descriptive statistics, Cronbach’s alpha and Kruskal-Wallis test statistics. Based on the research, the study reveals that weakness in the operational system, contractors’ lack of capability in terms of finances and lack of experience of the contractor are the major factors resulting in the delayed completion of civil engineering projects. The findings of the study are intended to offer those involved in civil construction projects appropriate solutions for countering schedule delays. UiTM Press 2024-09 Article PeerReviewed text en https://ir.uitm.edu.my/id/eprint/109930/1/109930.pdf Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]. (2024) Built Environment Journal <https://ir.uitm.edu.my/view/publication/Built_Environment_Journal/>, 21: 3. pp. 23-36. ISSN 2637-0395
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TA Engineering. Civil engineering
spellingShingle TA Engineering. Civil engineering
Sharuddin, Nurul Mahirah
Azman, Mohd Azrai
Abdul Samad, Zulkiflee
Mohd Rodzi, Rodziana
Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]
description A schedule delay occurs when there is an event or condition that delays the project's commencement or progress. In this case, the completion and delivery of construction projects are deemed ineffective if they fail to satisfy the predetermined criteria, budget, schedule, and stakeholder expectations. As a result, early detection of delays is critical to minimizing their impact on construction project performance. Consequently, this research aims to investigate the relationship between schedule delay factors and project performance in civil engineering works. To achieve this, the contributing factors of schedule delays, the effects of schedule delays and ways that can be taken to overcome schedule delays were identified using questionnaire surveys. The surveys were distributed to G7 civil engineering contractors and 144 were returned. Then, the data collected were analysed using descriptive statistics, Cronbach’s alpha and Kruskal-Wallis test statistics. Based on the research, the study reveals that weakness in the operational system, contractors’ lack of capability in terms of finances and lack of experience of the contractor are the major factors resulting in the delayed completion of civil engineering projects. The findings of the study are intended to offer those involved in civil construction projects appropriate solutions for countering schedule delays.
format Article
author Sharuddin, Nurul Mahirah
Azman, Mohd Azrai
Abdul Samad, Zulkiflee
Mohd Rodzi, Rodziana
author_facet Sharuddin, Nurul Mahirah
Azman, Mohd Azrai
Abdul Samad, Zulkiflee
Mohd Rodzi, Rodziana
author_sort Sharuddin, Nurul Mahirah
title Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]
title_short Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]
title_full Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]
title_fullStr Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]
title_full_unstemmed Relationship between schedule delay factors and project performance in civil engineering works / Nurul Mahirah Sharuddin ... [et al.]
title_sort relationship between schedule delay factors and project performance in civil engineering works / nurul mahirah sharuddin ... [et al.]
publisher UiTM Press
publishDate 2024
url https://ir.uitm.edu.my/id/eprint/109930/1/109930.pdf
https://ir.uitm.edu.my/id/eprint/109930/
_version_ 1825165134024146944
score 13.239859