Reinforced concrete building design project & project based learning / Anis Balqis Irdina Jamal Nasir

In preparation of this report, students need to search for a complete architectural drawing according to the Uniform Building By-Laws, UBBL (1994). After the drawing has been obtained, student are required to prepare a project schedule by using Microsoft Project software. The function of preparing a...

Full description

Saved in:
Bibliographic Details
Main Author: Jamal Nasir, Anis Balqis Irdina
Format: Student Project
Language:English
Published: 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/108851/1/108851.pdf
https://ir.uitm.edu.my/id/eprint/108851/
Tags: Add Tag
No Tags, Be the first to tag this record!