Reinforced concrete building design project & project based learning / Anis Balqis Irdina Jamal Nasir
In preparation of this report, students need to search for a complete architectural drawing according to the Uniform Building By-Laws, UBBL (1994). After the drawing has been obtained, student are required to prepare a project schedule by using Microsoft Project software. The function of preparing a...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2022
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/108851/1/108851.pdf https://ir.uitm.edu.my/id/eprint/108851/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|