Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
The Malaysian government has taken the initiative of implementing Industrialised Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works. I...
Saved in:
Main Authors: | Osman, Wan Nadzri, Mohd Nawi, Mohd Nasrun, Anuar, Herman Shah, Radzuan, Kamaruddin |
---|---|
Format: | Article |
Language: | English |
Published: |
Science Publishing Corporation Inc
2015
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/31814/1/IJET%2077%2004%202015%2094-95.pdf https://repo.uum.edu.my/id/eprint/31814/ https://www.sciencepubco.com/index.php/ijet/about |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
by: Osman, Wan Nadzri, et al.
Published: (2015) -
Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
by: Mohd Nasrun, Mohd Nawi, et al.
Published: (2014) -
Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
by: Mohd Nawi Mohd Nasrun, Lee Angela, Azman Mohamed Nor Azhari, Mohamad Kamar Kamarul Anuar,
Published: (2014) -
Barriers to implementation of the Industrialised Building System (IBS) in Malaysia
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2011)