Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects

The Malaysian government has taken the initiative of implementing Industrialised Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works. I...

Full description

Saved in:
Bibliographic Details
Main Authors: Osman, Wan Nadzri, Mohd Nawi, Mohd Nasrun, Anuar, Herman Shah, Radzuan, Kamaruddin
Format: Article
Language:English
Published: Science Publishing Corporation Inc 2015
Subjects:
Online Access:https://repo.uum.edu.my/id/eprint/31814/1/IJET%2077%2004%202015%2094-95.pdf
https://repo.uum.edu.my/id/eprint/31814/
https://www.sciencepubco.com/index.php/ijet/about
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.31814
record_format eprints
spelling my.uum.repo.318142025-01-07T13:15:30Z https://repo.uum.edu.my/id/eprint/31814/ Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects Osman, Wan Nadzri Mohd Nawi, Mohd Nasrun Anuar, Herman Shah Radzuan, Kamaruddin HD Industries. Land use. Labor The Malaysian government has taken the initiative of implementing Industrialised Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works. It is hope that IBS can improve the performance of construction industry. However, the main barriers in IBS implementation is project delivery process. In order to overcome this barrier, ‘Integrated Project Delivery (IPD)’ as a project delivery system using a multi-party contract (more than two parties selected) was introduced. Integrated Project Delivery (IPD) is defined as a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all project participants to optimise the results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication and construction. Although, many researchers have argue the importance of IPD in project delivery process, but the readiness of construction industries must be established. This research will use a quantitative study. This quantitative research process will involve a few phases including literature review stage, data collection stage, framework development stage, validation and recommendation stage. As the aim of this research is to obtain data based on multidisciplinary IBS stakeholders’ perspectives, respondent include project managers, resident engineers, and architects, contractors etc. are among the potential candidates. At the end of the process, this research will develops the readiness assessment model to implement IPD in IBS construction projects Science Publishing Corporation Inc 2015 Article PeerReviewed application/pdf en https://repo.uum.edu.my/id/eprint/31814/1/IJET%2077%2004%202015%2094-95.pdf Osman, Wan Nadzri and Mohd Nawi, Mohd Nasrun and Anuar, Herman Shah and Radzuan, Kamaruddin (2015) Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects. International Journal of Engineering & Technology, 77 (4). pp. 91-95. ISSN 2227-524X https://www.sciencepubco.com/index.php/ijet/about
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutional Repository
url_provider http://repo.uum.edu.my/
language English
topic HD Industries. Land use. Labor
spellingShingle HD Industries. Land use. Labor
Osman, Wan Nadzri
Mohd Nawi, Mohd Nasrun
Anuar, Herman Shah
Radzuan, Kamaruddin
Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
description The Malaysian government has taken the initiative of implementing Industrialised Building System (IBS) in which components are manufactured in mass production under a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works. It is hope that IBS can improve the performance of construction industry. However, the main barriers in IBS implementation is project delivery process. In order to overcome this barrier, ‘Integrated Project Delivery (IPD)’ as a project delivery system using a multi-party contract (more than two parties selected) was introduced. Integrated Project Delivery (IPD) is defined as a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all project participants to optimise the results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication and construction. Although, many researchers have argue the importance of IPD in project delivery process, but the readiness of construction industries must be established. This research will use a quantitative study. This quantitative research process will involve a few phases including literature review stage, data collection stage, framework development stage, validation and recommendation stage. As the aim of this research is to obtain data based on multidisciplinary IBS stakeholders’ perspectives, respondent include project managers, resident engineers, and architects, contractors etc. are among the potential candidates. At the end of the process, this research will develops the readiness assessment model to implement IPD in IBS construction projects
format Article
author Osman, Wan Nadzri
Mohd Nawi, Mohd Nasrun
Anuar, Herman Shah
Radzuan, Kamaruddin
author_facet Osman, Wan Nadzri
Mohd Nawi, Mohd Nasrun
Anuar, Herman Shah
Radzuan, Kamaruddin
author_sort Osman, Wan Nadzri
title Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
title_short Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
title_full Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
title_fullStr Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
title_full_unstemmed Readiness Assessment for Implementation of Integrated Project Delivery (IPD) in Industrialised Building System (IBS) Projects
title_sort readiness assessment for implementation of integrated project delivery (ipd) in industrialised building system (ibs) projects
publisher Science Publishing Corporation Inc
publishDate 2015
url https://repo.uum.edu.my/id/eprint/31814/1/IJET%2077%2004%202015%2094-95.pdf
https://repo.uum.edu.my/id/eprint/31814/
https://www.sciencepubco.com/index.php/ijet/about
_version_ 1821005506584510464
score 13.22586