A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects
The construction industry plays an important role in developing a nation to a fully developed status. The construction industry, unlike other industries has unique problems concerning project completion. Projects are now more complicated involving huge contract values, participants from multi-discip...
Saved in:
Main Authors: | Ramanathan, C.T., Narayanan, S.P. |
---|---|
Format: | Conference or Workshop Item |
Published: |
IEEE Computer Society
2014
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-84988286497&doi=10.1109%2fIEEM.2014.7058680&partnerID=40&md5=12c68465770f1571268ac8774b1494bc http://eprints.utp.edu.my/31701/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects
by: C.T, Ramanathan, et al.
Published: (2014) -
TEAM BUILDING AND COORDINATION FOR DESIGN -BUILD MULTIPLE PROJECTS
by: C.T, Ramanathan, et al.
Published: (2007) -
CONSTRUCTION OF MULTIPLE DESIGN AND BUILD BRIDGE PROJECTS
IN SABAH
by: C.T, Ramanathan, et al.
Published: (2010) -
MANAGING RISK CONSTRAINTS OF MULTIPLE DESIGN & BUILD PROJECTS
by: Sambu Potty, Narayanan, et al.
Published: (2011) -
Construction delays causing risks on time and cost - a critical review
by: C.T, Ramanathan, et al.
Published: (2012)