A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects

The construction industry plays an important role in developing a nation to a fully developed status. The construction industry, unlike other industries has unique problems concerning project completion. Projects are now more complicated involving huge contract values, participants from multi-discip...

Full description

Saved in:
Bibliographic Details
Main Authors: Ramanathan, C.T., Narayanan, S.P.
Format: Conference or Workshop Item
Published: IEEE Computer Society 2014
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-84988286497&doi=10.1109%2fIEEM.2014.7058680&partnerID=40&md5=12c68465770f1571268ac8774b1494bc
http://eprints.utp.edu.my/31701/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utp.eprints.31701
record_format eprints
spelling my.utp.eprints.317012022-03-29T03:35:17Z A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects Ramanathan, C.T. Narayanan, S.P. The construction industry plays an important role in developing a nation to a fully developed status. The construction industry, unlike other industries has unique problems concerning project completion. Projects are now more complicated involving huge contract values, participants from multi-discipline, more specialised works, tighter schedule, more cost consciousness, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that play significant role in construction project management. In Malaysia very few studies have been attempted on the factors causing time delay. Besides, there has been no such study related to multiple Design and Build (DandB) projects. The study focused on DandB projects which have complicated risk governed with fixed time and a fixed contract sum (Lump sum). Thus there is a need for comparative study on the risk factors causing this time delay which enables the Malaysian construction to respond proactively and more effectively to time delay factors. © 2014 IEEE. IEEE Computer Society 2014 Conference or Workshop Item NonPeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-84988286497&doi=10.1109%2fIEEM.2014.7058680&partnerID=40&md5=12c68465770f1571268ac8774b1494bc Ramanathan, C.T. and Narayanan, S.P. (2014) A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects. In: UNSPECIFIED. http://eprints.utp.edu.my/31701/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
description The construction industry plays an important role in developing a nation to a fully developed status. The construction industry, unlike other industries has unique problems concerning project completion. Projects are now more complicated involving huge contract values, participants from multi-discipline, more specialised works, tighter schedule, more cost consciousness, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that play significant role in construction project management. In Malaysia very few studies have been attempted on the factors causing time delay. Besides, there has been no such study related to multiple Design and Build (DandB) projects. The study focused on DandB projects which have complicated risk governed with fixed time and a fixed contract sum (Lump sum). Thus there is a need for comparative study on the risk factors causing this time delay which enables the Malaysian construction to respond proactively and more effectively to time delay factors. © 2014 IEEE.
format Conference or Workshop Item
author Ramanathan, C.T.
Narayanan, S.P.
spellingShingle Ramanathan, C.T.
Narayanan, S.P.
A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects
author_facet Ramanathan, C.T.
Narayanan, S.P.
author_sort Ramanathan, C.T.
title A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects
title_short A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects
title_full A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects
title_fullStr A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects
title_full_unstemmed A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects
title_sort comparative study among stakeholders on causes of time delay in malaysian multiple design and build projects
publisher IEEE Computer Society
publishDate 2014
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-84988286497&doi=10.1109%2fIEEM.2014.7058680&partnerID=40&md5=12c68465770f1571268ac8774b1494bc
http://eprints.utp.edu.my/31701/
_version_ 1738657284361289728
score 13.211869