Solving a hybrid jobshop scheduling problem with space constraints and reentrant processesby using an improved hybrid genetic algorithm: a case study

In this paper, several concepts and techniques of a job shop manufacturing system are adjusted and utilized in a real-world pipe spool fabrication shop scheduling problem. In the present study, an improved hybrid genetic algorithm is developed to create a feasible and active schedule for the operati...

Full description

Saved in:
Bibliographic Details
Main Authors: Moghadam, A. M., Wong, K. Y., Piroozfard, H.
Format: Article
Published: University of Cincinnati 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/77148/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85041473194&partnerID=40&md5=99033bee3207deea45264a3f4eb7a0bb
Tags: Add Tag
No Tags, Be the first to tag this record!