Solving a hybrid jobshop scheduling problem with space constraints and reentrant processesby using an improved hybrid genetic algorithm: a case study
In this paper, several concepts and techniques of a job shop manufacturing system are adjusted and utilized in a real-world pipe spool fabrication shop scheduling problem. In the present study, an improved hybrid genetic algorithm is developed to create a feasible and active schedule for the operati...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Published: |
University of Cincinnati
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/77148/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85041473194&partnerID=40&md5=99033bee3207deea45264a3f4eb7a0bb |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|