Construction of precast segmental box girder bridge using overhead gantry - a case study
The bridge construction utilizing the concept of erecting the precast segmental panel has been a chosen method for bridge construction within restricted area. This method has been successfully exhibit the constructability within the urban area and also crossing the wide water body, valley and existi...
Saved in:
Main Author: | Salleh @ Mohamed Salleh, Jazlan |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/4586/1/JazlanSallehMFKA2006.pdf http://eprints.utm.my/id/eprint/4586/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of precast segmental box girder bridges
by: Elmahadi, Mohamed Abdelfatah
Published: (2008) -
Comparison method of segmental box girder (SBG) erection using launching gantry and trestle in MRT project
by: Mohamad Talib, Siti Bazura
Published: (2019) -
Finite element analysis of prestressed concrete box girder bridge
by: Othman, Rebaz Abdulghafoor
Published: (2013) -
Structural performance evaluation of a precast PSC curved girder bridge constructed using multi-tasking formwork
by: Kim, S. J., et al.
Published: (2016) -
The mechanical properties of high strength concrete for box girder bridge deck in Malaysia
by: Adnan, Azlan, et al.
Published: (2010)