Construction of precast segmental box girder bridge using overhead gantry - a case study
The bridge construction utilizing the concept of erecting the precast segmental panel has been a chosen method for bridge construction within restricted area. This method has been successfully exhibit the constructability within the urban area and also crossing the wide water body, valley and existi...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/4586/1/JazlanSallehMFKA2006.pdf http://eprints.utm.my/id/eprint/4586/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|