Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge
Nowadays, construction projects are becoming much more complex and difficult which include the bridge project. Thus, delay in project duration and overrun in project cost becomes a common occurrence which sometime the quality and safety aspect also been affected. Previous studies show that one of th...
Saved in:
Main Author: | Zahidi, Mardiyah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/18183/1/MardiyahZahidiMFKA2009.pdf http://eprints.utm.my/id/eprint/18183/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Cable stayed bridge construction : case study of Sungai Johor cable stayed bridge
by: Lee, Foo Wei
Published: (2009) -
Analysis of under-deck cable stayed bridge and combined cable stayed bridge
by: Ahmad Zakwan, Zulkefly
Published: (2015) -
Fatigue of cable anchorages on a cable-stayed bridge
by: Nor Ashikin, Muhamad Khairussaleh
Published: (2016) -
Analysis of hybrid arch and cable-stayed bridge
by: Hasmida, Noordin
Published: (2015) -
Optimization of Pre-Tensioning Cable Forces in Highly Redundant Cable-Stayed Bridges
by: Asgari, Banafsheh, et al.
Published: (2015)