Energy audit and retrofit of lighting system at Institut Latihan Perindustrian (ILP) Tangkak, Johor
The global electricity consumption demand grows at 2.1% per year from 2018 to 2040. Historically, the growth of Malaysia demand from 2015 to 2020 is 16,822MW to 18,808MW, or at 2.3% annually. Nowadays, people are more concerned about energy efficiency and conservation in buildings. The government ne...
Saved in:
Main Author: | Tuan Sembak, Syed Mohd. Aizuddin |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2022
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/101761/1/SyedMohd.AizuddinMSChE2022.pdf.pdf http://eprints.utm.my/id/eprint/101761/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:152369 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Pembangunan sistem pengkalan data perolehan bahan latihan di Institut Latihan Perindustrian Muar (ILP Muar)
by: Ahmad, Zainudin
Published: (2006) -
Pengambilan Pelajar Di Institut Latihan Perindustrian (ILP) Mengikut Bidang Latihan dan Jantina, 2009-2010
by: Kementerian Sumber Manusia
Published: (2012) -
Pengeluaran pelajar di Institut Latihan Perindustrian (ILP) mengikut bidang latihan dan jantina, 2009 - 2010
by: Kementerian Sumber Manusia
Published: (2012) -
Analisis penawaran tenaga buruh mahir dan separuh mahir oleh institut latihan perindustrian (ILP) dalam sektor perindustrian
by: Jusoh, Rozita
Published: (2003) -
The relationship between work environment and employees’ job satisfaction at Institut Latihan Perindustrian Kuantan (ILP KUANTAN) / Nurul Jannah Abd Aziz
by: Abd Aziz, Nurul Jannah
Published: (2019)