Development Of Overall Performance Effectiveness In Job Shop Manufacturing Process
Overall equipment effectiveness (OEE) is implemented by the case company,an aerospace part manufacturing company, to encourage machines to operate all the time at the ideal speed and produce no quality defect in extreme case.However,integration between workstations and transporting activities,deviat...
Saved in:
Main Author: | Teoh, Yong Siang |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2018
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/23380/1/Development%20Of%20Overall%20Performance%20Effectiveness%20In%20Job%20Shop%20Manufacturing%20Process.pdf http://eprints.utem.edu.my/id/eprint/23380/2/Development%20Of%20Overall%20Performance%20Effectiveness%20In%20Job%20Shop%20Manufacturing%20Process.pdf http://eprints.utem.edu.my/id/eprint/23380/ https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=112881 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Customer demand and planning efficiency in overall equipment effectiveness (OEE)
by: Teoh, Yong Siang
Published: (2013) -
Optimization-based simulation algorithm for predictive-reactive job-shop scheduling of reconfigurable manufacturing systems
by: Tan, Joe Yee
Published: (2022) -
Classification Of Losses In Overall Equipment Effectiveness Calculation
by: A. Perumal, Puvanasvaran, et al.
Published: (2019) -
Effect Of Hidden Wastes In Overall Equipment Effectiveness Calculation
by: A. Perumal, Puvanasvaran, et al.
Published: (2017) -
Implementation of overall equipment effectiveness in surface mounting technology
by: V. Nanjan, Davandran
Published: (2019)