Improving Overall Equipment Effectiveness Using Lean Six Sigma In Lube Blending Plant- A Case Study

Overall Equipment Effectiveness (OEE) is a key indicator to measure operation performance and it has been introduced in Total Productive Maintenance (TPM) whichfocused towards zero breakdown, zero defect and zero incident. Since then, OEE has been evolved to wider application from measuring only sin...

Full description

Saved in:
Bibliographic Details
Main Author: Tukiran, Mohd Azizi
Format: Thesis
Language:English
English
Published: 2020
Subjects:
Online Access:http://eprints.utem.edu.my/id/eprint/25497/1/Improving%20Overall%20Equipment%20Effectiveness%20Using%20Lean%20Six%20Sigma%20In%20Lube%20Blending%20Plant-%20A%20Case%20Study.pdf
http://eprints.utem.edu.my/id/eprint/25497/2/Improving%20Overall%20Equipment%20Effectiveness%20Using%20Lean%20Six%20Sigma%20In%20Lube%20Blending%20Plant-%20A%20Case%20Study.pdf
http://eprints.utem.edu.my/id/eprint/25497/
https://plh.utem.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=119125
Tags: Add Tag
No Tags, Be the first to tag this record!