Cycle Time Reduction For Coil Setup Process Through Standard Work: Case Study In Ceramic Industry
In this study, it found that the cycle time of the setup process in a pressing process is inconsistent. This is due to the absence of proper working instruction and workers perform the setup process in varying working steps. Therefore, a new method of the coil setup was developed and standardized wh...
Saved in:
Main Authors: | A. Perumal, Puvanasvaran, M. N. H., Ab. Hamid, Yoong, Sai Sieng |
---|---|
Format: | Article |
Language: | English |
Published: |
Asian Research Publishing Network (ARPN)
2018
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/21245/2/ARPN%202018_STANDARD%20WORK.pdf http://eprints.utem.edu.my/id/eprint/21245/ http://www.arpnjournals.org/jeas/research_papers/rp_2018/jeas_0118_6656.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Setup Time Reduction in a CNC Production Facility Through Redesign of Jigs and Fixtures
by: Lam, Pei Xian
Published: (2016) -
Classification Of Losses In Overall Equipment Effectiveness Calculation
by: A. Perumal, Puvanasvaran, et al.
Published: (2019) -
Effect Of Hidden Wastes In Overall Equipment Effectiveness Calculation
by: A. Perumal, Puvanasvaran, et al.
Published: (2017) -
Achieving large cycle time reductions through mold surface modifications
by: Abdullah , Mohamad Zaki, et al.
Published: (2005) -
Experimental setup and biomechanics measurement of knee pads
by: Sakinah, Muhamad Hisham
Published: (2013)