Overall equipment efficiency improvement using time study in an aerospace industry
This paper highlights a methodology used to improve the Overall Equipment Efficiency (OEE) of the autoclave process through the implementation of time studies. In this paper, two types of time study are employed where the initial time study conducted was the direct stopwatch time study used to valid...
Saved in:
Main Authors: | A. Perumal, Puvanasvaran, Chiang, Ze Mei, Andiappan, Alagendran |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier Ltd
2013
|
Subjects: | |
Online Access: | http://eprints.utem.edu.my/id/eprint/10802/1/MITC_paper.pdf http://eprints.utem.edu.my/id/eprint/10802/ https://www.sciencedirect.com/science/article/pii/S187770581302033X |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
CONSIDERATION OF DEMAND RATE IN OVERALL EQUIPMENT EFFECTIVENESS (OEE) ON EQUIPMENT WITH CONSTANT PROCESS TIME
by: A. P., Puvanasvaran
Published: (2013) -
Productivity improvement using overall equipment efficiency in semiconductor industry
by: Chinnappan, Ushananthini
Published: (2021) -
Classification Of Losses In Overall Equipment Effectiveness Calculation
by: A. Perumal, Puvanasvaran, et al.
Published: (2019) -
Effect Of Hidden Wastes In Overall Equipment Effectiveness Calculation
by: A. Perumal, Puvanasvaran, et al.
Published: (2017) -
Interrelationship Between Availability With Planning Factor and Mean Time Between Failures (MTBF) in Overall Equipment Effectiveness (OEE)
by: A. P., Puvanasvaran
Published: (2012)