Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study
In the late 1900s and early 2000s, there were a few newly founded foundries that were better organized and used contemporary machinery to make high-quality iron and steel castings in small and medium-sized enterprises (SMEs). The late delivery of a particular product was one of the most important...
Saved in:
Main Author: | Azhan, Anis Masturina |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Sains Malaysia
2022
|
Subjects: | |
Online Access: | http://eprints.usm.my/55457/1/Reduce%20Manufacturing%20Lead%20Time%20Through%20Pdca%20And%20Waste%20Elimination%20In%20Metal%20Casting%20Company%20A%20Case%20Study_Anis%20Masturina%20Azhan.pdf http://eprints.usm.my/55457/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Process improvement on manufacturing floor through PDCA methodology
by: Mohd Sabri, Hussin, et al.
Published: (2016) -
Improving Quality of Light Commercial Vehicle Using PDCA Approach
by: Nabiilah, Ab Rahim, et al.
Published: (2018) -
A case study: Plan-Do-Check- Act (PDCA) cycle to reduce defects in manufacturing process of injection moulding in plastic parts / Nur Farahim Aziz
by: Aziz, Nur Farahim
Published: (2022) -
Quality improvement in electrodeposition process of commercial vehicle using PDCA approach
by: Nabiilah, Ab Rahim
Published: (2018) -
Developing Android Application To Guide Lean Six Sigma PDCA Project
by: Ong, Sin Joo
Published: (2018)