Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study
In the late 1900s and early 2000s, there were a few newly founded foundries that were better organized and used contemporary machinery to make high-quality iron and steel castings in small and medium-sized enterprises (SMEs). The late delivery of a particular product was one of the most important...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Sains Malaysia
2022
|
Subjects: | |
Online Access: | http://eprints.usm.my/55457/1/Reduce%20Manufacturing%20Lead%20Time%20Through%20Pdca%20And%20Waste%20Elimination%20In%20Metal%20Casting%20Company%20A%20Case%20Study_Anis%20Masturina%20Azhan.pdf http://eprints.usm.my/55457/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.usm.eprints.55457 |
---|---|
record_format |
eprints |
spelling |
my.usm.eprints.55457 http://eprints.usm.my/55457/ Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study Azhan, Anis Masturina T Technology TJ Mechanical engineering and machinery In the late 1900s and early 2000s, there were a few newly founded foundries that were better organized and used contemporary machinery to make high-quality iron and steel castings in small and medium-sized enterprises (SMEs). The late delivery of a particular product was one of the most important challenges experienced by foundry experts and researchers throughout manufacturing. Consequently, the customer experienced unsatisfactory service. Utilizing the PDCA continuous improvement cycle is necessary since it is a crucial tool for raising the quality of a product over time and minimizing waste. To save time, it was used in an attempt in this thesis study. The major purpose of this thesis is to reduce the manufacturing lead time of metal casting using the PDCA cycle and waste elimination in the administration department. The potential waste that might occur during the manufacturing lead time has been identified via a review of the relevant literature and the implementation of fishbone diagrams in the root cause analysis step. Then, as a potential countermeasure, the WITNESS Horizon simulation was used to examine and compare production line models with and without motion waste. This thesis found that the simulation model 3 showed the lowest lead-time compared to simulation model 1 and 2 with the elimination of all motion waste at the discussion section. It can be concluded that with the implementation of PDCA cycle in this thesis, the lead-time of metal casting process has been improved by 4.34% systematically. It was proven that the PDCA cycle is an excellent tool to reduce the metal casting process. Universiti Sains Malaysia 2022-07-24 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/55457/1/Reduce%20Manufacturing%20Lead%20Time%20Through%20Pdca%20And%20Waste%20Elimination%20In%20Metal%20Casting%20Company%20A%20Case%20Study_Anis%20Masturina%20Azhan.pdf Azhan, Anis Masturina (2022) Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study. Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Mekanikal. (Submitted) |
institution |
Universiti Sains Malaysia |
building |
Hamzah Sendut Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Sains Malaysia |
content_source |
USM Institutional Repository |
url_provider |
http://eprints.usm.my/ |
language |
English |
topic |
T Technology TJ Mechanical engineering and machinery |
spellingShingle |
T Technology TJ Mechanical engineering and machinery Azhan, Anis Masturina Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study |
description |
In the late 1900s and early 2000s, there were a few newly founded foundries that were better organized and used contemporary machinery to make high-quality iron and steel
castings in small and medium-sized enterprises (SMEs). The late delivery of a particular product was one of the most important challenges experienced by foundry experts and researchers throughout manufacturing. Consequently, the customer experienced unsatisfactory service. Utilizing the PDCA continuous improvement cycle is necessary since it is a crucial tool for raising the quality of a product over time and minimizing waste. To save time, it was used in an attempt in this thesis study. The major purpose of this thesis is to
reduce the manufacturing lead time of metal casting using the PDCA cycle and waste elimination in the administration department. The potential waste that might occur during the
manufacturing lead time has been identified via a review of the relevant literature and the implementation of fishbone diagrams in the root cause analysis step. Then, as a potential
countermeasure, the WITNESS Horizon simulation was used to examine and compare production line models with and without motion waste. This thesis found that the simulation
model 3 showed the lowest lead-time compared to simulation model 1 and 2 with the elimination of all motion waste at the discussion section. It can be concluded that with the
implementation of PDCA cycle in this thesis, the lead-time of metal casting process has been improved by 4.34% systematically. It was proven that the PDCA cycle is an excellent tool to reduce the metal casting process. |
format |
Monograph |
author |
Azhan, Anis Masturina |
author_facet |
Azhan, Anis Masturina |
author_sort |
Azhan, Anis Masturina |
title |
Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study |
title_short |
Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study |
title_full |
Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study |
title_fullStr |
Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study |
title_full_unstemmed |
Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study |
title_sort |
reduce manufacturing lead time through pdca and waste elimination in metal casting company: a case study |
publisher |
Universiti Sains Malaysia |
publishDate |
2022 |
url |
http://eprints.usm.my/55457/1/Reduce%20Manufacturing%20Lead%20Time%20Through%20Pdca%20And%20Waste%20Elimination%20In%20Metal%20Casting%20Company%20A%20Case%20Study_Anis%20Masturina%20Azhan.pdf http://eprints.usm.my/55457/ |
_version_ |
1748703963956379648 |
score |
13.211869 |