Factors affecting speed of industrialized building system (IBS) projects in Malaysia
This study attempts to identify the factors affect the speed of IBS and the probability level to select either IBS or conventional method. A questionnaire was distributed in order to collect the data. It consists of 6 main factors namely: high productivity of structural elements, using of moulds,...
Saved in:
Main Authors: | Alaghbari, Wa’el, A. , Salim, M. R. , Abdul Kadir, A. , Asonway |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.usm.my/34425/1/HBP4.pdf http://eprints.usm.my/34425/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Factors influencing low cost housing in Sana’a – Yemen
by: Wa’el , Alaghbari, et al.
Published: (2008) -
Industrialised Building System (Ibs)
Scoring System - Case Study
by: Ibrahim, Siti Rus‘Adneen
Published: (2006) -
A review of delay factors in Malaysian Industrialized Building System (IBS) construction project
by: Mohd Nasir, Najuwa, et al.
Published: (2016) -
A Critical Review of Factors Affecting Manpower and Equipment
Productivity in Tall Building Construction Projects
by: Parthasarathy, Mudumbai Krishnaswamy, et al.
Published: (2017) -
Innovation Barriers and Enablers that Affect Productivity
in Uganda Building Industry
by: Alinaitwe, Henry Mwanaki, et al.
Published: (2007)