Factors affecting speed of industrialized building system (IBS) projects in Malaysia

This study attempts to identify the factors affect the speed of IBS and the probability level to select either IBS or conventional method. A questionnaire was distributed in order to collect the data. It consists of 6 main factors namely: high productivity of structural elements, using of moulds,...

Full description

Saved in:
Bibliographic Details
Main Authors: Alaghbari, Wa’el, A. , Salim, M. R. , Abdul Kadir, A. , Asonway
Format: Conference or Workshop Item
Language:English
Published: 2008
Subjects:
Online Access:http://eprints.usm.my/34425/1/HBP4.pdf
http://eprints.usm.my/34425/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items