Factors affecting speed of industrialized building system (IBS) projects in Malaysia
This study attempts to identify the factors affect the speed of IBS and the probability level to select either IBS or conventional method. A questionnaire was distributed in order to collect the data. It consists of 6 main factors namely: high productivity of structural elements, using of moulds,...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.usm.my/34425/1/HBP4.pdf http://eprints.usm.my/34425/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|