Impacts of adding knowledge flow to an activity‑based framework for conceptual design phase on performance of building projects
The construction industry suffers from an incomplete knowledge flow that leads to overrun cost and time. A considerable portion of this problem is attributable to the design stage which is a tacit knowledge-dominated area. Since knowledge tacitness results in an incomplete knowledge flow, we posit t...
Saved in:
Main Authors: | Pourzolfaghar, Zohreh, Ibrahim, Rahinah |
---|---|
Format: | Article |
Language: | English |
Published: |
Academic Conferences and Publishing International Limited
2014
|
Online Access: | http://psasir.upm.edu.my/id/eprint/37960/1/Impacts%20of%20adding%20knowledge%20flow%20to%20an%20activity%E2%80%91based%20framework%20for%20conceptual%20design%20phase%20on%20performance%20of%20building%20projects.pdf http://psasir.upm.edu.my/id/eprint/37960/ http://www.ejkm.com/volume12/issue3 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Improving knowledge capture during conceptual design phase of building projects
by: Pourzolfaghar, Zohreh
Published: (2011) -
Explicating mechanical and electrical knowledge for design phase of green building projects
by: Pourzolfaghar, Zohreh, et al.
Published: (2016) -
A technique to capture multi-disciplinary tacit knowledge during the conceptual design phase of a building project
by: Pourzolfaghar, Zohreh, et al.
Published: (2014) -
Improving dynamic knowledge movements with a knowledge movements with a knowledge-based framework during conceptual design of a green building project
by: Pourzolfaghar, Zohreh, et al.
Published: (2013) -
Analysis of knowledge flows in a construction project using a social network analysis tool
by: Ibrahim, Rahinah
Published: (2005)