Impacts of adding knowledge flow to an activity‑based framework for conceptual design phase on performance of building projects

The construction industry suffers from an incomplete knowledge flow that leads to overrun cost and time. A considerable portion of this problem is attributable to the design stage which is a tacit knowledge-dominated area. Since knowledge tacitness results in an incomplete knowledge flow, we posit t...

Full description

Saved in:
Bibliographic Details
Main Authors: Pourzolfaghar, Zohreh, Ibrahim, Rahinah
Format: Article
Language:English
Published: Academic Conferences and Publishing International Limited 2014
Online Access:http://psasir.upm.edu.my/id/eprint/37960/1/Impacts%20of%20adding%20knowledge%20flow%20to%20an%20activity%E2%80%91based%20framework%20for%20conceptual%20design%20phase%20on%20performance%20of%20building%20projects.pdf
http://psasir.upm.edu.my/id/eprint/37960/
http://www.ejkm.com/volume12/issue3
Tags: Add Tag
No Tags, Be the first to tag this record!