Data acquisition system for Kenyir hydroelectric power plant.
The national electricity board of the States of Malaya has been using the state-of-the-art technology for process control at its power generating stations and control centres. Kenyir Hydroelectric Power Station, which is located in the state of Terengganu and has been constructed and commissioned re...
Saved in:
Main Authors: | Mansor, Mohamad Isa, Ghows Khan, Osman Khan |
---|---|
Format: | Conference or Workshop Item |
Language: | English English |
Published: |
1986
|
Online Access: | http://psasir.upm.edu.my/id/eprint/18001/1/ID%2018001.pdf http://psasir.upm.edu.my/id/eprint/18001/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Recreational fishery, Kenyir Lake Malaysia
by: Ambak, Mohd Azmi, et al.
Published: (1999) -
Technical visit to the Bakun Hydroelectric Power Project Site
by: Jong, Edwin NT, Dr.
Published: (2011) -
Feasibility study of hydroelectric power installation at existing canal
by: Mohd Mursyid bin Sulaiman
Published: (2023) -
Hazards identification for safety and risk evaluation of hydroelectric dam power generation plant / Ali Mohammad Saedi
by: Saedi, Ali Mohammad
Published: (2013) -
Modelling of micro hydroelectric system design
by: Ibrahim, Noor Azliza
Published: (2012)