Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation

A reservoir operation was reviewed to optimize the total annual hydroelectric power generation. Analysis were conducted in a week period of time using daily data of reservoir level, turbine release, power generated, rainfall and evaporation. The length of data varies from 4-20 years (1991-2010). A t...

Full description

Saved in:
Bibliographic Details
Main Authors: Asfaw, Tilahun Derib, Hashim, Ahmad Mustafa
Format: Conference or Workshop Item
Published: 2011
Subjects:
Online Access:http://eprints.utp.edu.my/5740/1/ICEII_2011-C015.pdf
http://eprints.utp.edu.my/5740/
Tags: Add Tag
No Tags, Be the first to tag this record!