Demand projection of trans-shipment facilities at Putrajaya
The primary aims of the study can be summarized as follows: 1. To cater loading or unloading of container in Putrajaya due to the increasing of population in Putrajaya in a short year. 2. To fulfilling the demand as a urban area especially like Putrajaya to cut off the unnecessary distribution cost...
Saved in:
Main Author: | Chai Chen Sheng |
---|---|
Format: | text::Thesis |
Language: | English |
Published: |
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
May 20 date for cencaluk shipment
by: New Straits Times, Malaysia
Published: (1988) -
First shipment of Perlis Harumanis sent to Sabah
by: Anon
Published: (2023) -
Shipment Tracking for Air Freight via Website
by: Mohd Sallehudin, Shahrul Razman
Published: (2004) -
Evaluating the parking demand at park and ride facility at Putrajaya public transportation terminal
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2013) -
Factors influencing the parking demand of the park and ride facility at Putrajaya public transportation terminal
by: Syed Adnan, Sharifah Adibah Alyia, et al.
Published: (2015)