Demand projection of trans-shipment facilities at Putrajaya

The primary aims of the study can be summarized as follows: 1. To cater loading or unloading of container in Putrajaya due to the increasing of population in Putrajaya in a short year. 2. To fulfilling the demand as a urban area especially like Putrajaya to cut off the unnecessary distribution cost...

Full description

Saved in:
Bibliographic Details
Main Author: Chai Chen Sheng
Format: text::Thesis
Language:English
Published: 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-21388
record_format dspace
spelling my.uniten.dspace-213882023-05-04T20:29:37Z Demand projection of trans-shipment facilities at Putrajaya Chai Chen Sheng The primary aims of the study can be summarized as follows: 1. To cater loading or unloading of container in Putrajaya due to the increasing of population in Putrajaya in a short year. 2. To fulfilling the demand as a urban area especially like Putrajaya to cut off the unnecessary distribution cost which is caused by traffic congestion, distance and consume of a lot time. 3. Besides to avoid the traffic congestion by the heavy vehicle and container truck in order the distribution is going on where it happens normally in the peak hour especially in the core area of Putrajaya. 2023-05-03T16:45:23Z 2023-05-03T16:45:23Z 2003 Resource Types::text::Thesis https://irepository.uniten.edu.my/handle/123456789/21388 en application/pdf
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
language English
description The primary aims of the study can be summarized as follows: 1. To cater loading or unloading of container in Putrajaya due to the increasing of population in Putrajaya in a short year. 2. To fulfilling the demand as a urban area especially like Putrajaya to cut off the unnecessary distribution cost which is caused by traffic congestion, distance and consume of a lot time. 3. Besides to avoid the traffic congestion by the heavy vehicle and container truck in order the distribution is going on where it happens normally in the peak hour especially in the core area of Putrajaya.
format Resource Types::text::Thesis
author Chai Chen Sheng
spellingShingle Chai Chen Sheng
Demand projection of trans-shipment facilities at Putrajaya
author_facet Chai Chen Sheng
author_sort Chai Chen Sheng
title Demand projection of trans-shipment facilities at Putrajaya
title_short Demand projection of trans-shipment facilities at Putrajaya
title_full Demand projection of trans-shipment facilities at Putrajaya
title_fullStr Demand projection of trans-shipment facilities at Putrajaya
title_full_unstemmed Demand projection of trans-shipment facilities at Putrajaya
title_sort demand projection of trans-shipment facilities at putrajaya
publishDate 2023
_version_ 1806426169181995008
score 13.222552