Implementation and use of multi chamber arresters for 33kV overhead lines in Malaysia
Multi chambers arresters were installed on 33kV bare overhead line in Malaysia to improve the line trippings due to lightning. In this pilot study, the line was equipped with line fault indicators and auto recloser for transient event recording. Field monitoring was carried out to determine feasibil...
Saved in:
Main Authors: | Abdullah, N., Osman, M., Kadir, M.Z.A.A., Hatta, N.M., Ariffin, M.F. |
---|---|
Format: | Conference Paper |
Language: | English |
Published: |
2020
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Implementation and use of multi chamber arresters for 33kV overhead lines in Malaysia
by: Abdullah N., et al.
Published: (2023) -
Surge Arrester Monitoring Implementation at 33kV Distribution Overhead Line in Malaysia
by: Abdullah N., et al.
Published: (2024) -
Statistical lightning study for 33kV overhead line in peninsular Malaysia
by: Hatta, N.M., et al.
Published: (2020) -
Statistical lightning study for 33kV overhead line in peninsular Malaysia
by: Hatta N.M., et al.
Published: (2023) -
Statistical Cloud-to-Ground Lightning Data and Its Implementation for 33kV Overhead Line in Peninsular Malaysia
by: Hatta N.M., et al.
Published: (2024)