Implementation and use of multi chamber arresters for 33kV overhead lines in Malaysia

Multi chambers arresters were installed on 33kV bare overhead line in Malaysia to improve the line trippings due to lightning. In this pilot study, the line was equipped with line fault indicators and auto recloser for transient event recording. Field monitoring was carried out to determine feasibil...

Full description

Saved in:
Bibliographic Details
Main Authors: Abdullah, N., Osman, M., Kadir, M.Z.A.A., Hatta, N.M., Ariffin, M.F.
Format: Conference Paper
Language:English
Published: 2020
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-12999
record_format dspace
spelling my.uniten.dspace-129992020-07-07T02:20:16Z Implementation and use of multi chamber arresters for 33kV overhead lines in Malaysia Abdullah, N. Osman, M. Kadir, M.Z.A.A. Hatta, N.M. Ariffin, M.F. Multi chambers arresters were installed on 33kV bare overhead line in Malaysia to improve the line trippings due to lightning. In this pilot study, the line was equipped with line fault indicators and auto recloser for transient event recording. Field monitoring was carried out to determine feasibility and reliability of the device in preventing line trippings due to lightning. The case study line has been experiencing a significant amount of lightning activities, a total of 1,805 lightning strikes, detected by TNBR Lightning Detection System during 6 months monitoring period with an average peak current of 18.61 kA. Observation of one-time indicators has shown that 31 out of 180 devices have operated during the monitoring period. Line lightning performance analysis was carried out to quantify the effectiveness of the device in reducing tripping rate. © 2019 IEEE. 2020-02-03T03:28:24Z 2020-02-03T03:28:24Z 2019 Conference Paper 10.1109/APL.2019.8815993 en
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
language English
description Multi chambers arresters were installed on 33kV bare overhead line in Malaysia to improve the line trippings due to lightning. In this pilot study, the line was equipped with line fault indicators and auto recloser for transient event recording. Field monitoring was carried out to determine feasibility and reliability of the device in preventing line trippings due to lightning. The case study line has been experiencing a significant amount of lightning activities, a total of 1,805 lightning strikes, detected by TNBR Lightning Detection System during 6 months monitoring period with an average peak current of 18.61 kA. Observation of one-time indicators has shown that 31 out of 180 devices have operated during the monitoring period. Line lightning performance analysis was carried out to quantify the effectiveness of the device in reducing tripping rate. © 2019 IEEE.
format Conference Paper
author Abdullah, N.
Osman, M.
Kadir, M.Z.A.A.
Hatta, N.M.
Ariffin, M.F.
spellingShingle Abdullah, N.
Osman, M.
Kadir, M.Z.A.A.
Hatta, N.M.
Ariffin, M.F.
Implementation and use of multi chamber arresters for 33kV overhead lines in Malaysia
author_facet Abdullah, N.
Osman, M.
Kadir, M.Z.A.A.
Hatta, N.M.
Ariffin, M.F.
author_sort Abdullah, N.
title Implementation and use of multi chamber arresters for 33kV overhead lines in Malaysia
title_short Implementation and use of multi chamber arresters for 33kV overhead lines in Malaysia
title_full Implementation and use of multi chamber arresters for 33kV overhead lines in Malaysia
title_fullStr Implementation and use of multi chamber arresters for 33kV overhead lines in Malaysia
title_full_unstemmed Implementation and use of multi chamber arresters for 33kV overhead lines in Malaysia
title_sort implementation and use of multi chamber arresters for 33kv overhead lines in malaysia
publishDate 2020
_version_ 1672614197621424128
score 13.211869