Determination of spillway capacity of proposed bengoh dam
The aim of the study is to determine the spillway capacity of proposed Bengoh dam. The proposed Bengoh dam is located 43 km away from Kuching city. The purpose of the construction of Bengoh dam is to supply more raw water supply to Batu Kitang Water Treatment Plant due to increase in water demand...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project Report |
Language: | English English |
Published: |
Universiti Malaysia Sarawak, UNIMAS
2009
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/4532/1/DETERMINATION%20OF%20SPILLWAY%20CAPACITY%20OF%20PROPOSED%20%2824pgs%29.pdf http://ir.unimas.my/id/eprint/4532/8/DETERMINATION%20OF%20SPILLWAY%20...%28fulltext%29.pdf http://ir.unimas.my/id/eprint/4532/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The aim of the study is to determine the spillway capacity of proposed
Bengoh dam. The proposed Bengoh dam is located 43 km away from Kuching city.
The purpose of the construction of Bengoh dam is to supply more raw water supply
to Batu Kitang Water Treatment Plant due to increase in water demand in Kuching
area. The geography and hydrology location of Sg. Bengoh make it suitable to
construct a dam in that location. The Bengoh dam’s spillway should be able to pass
the peak outflow during the design flood in Sg. Bengoh. In this study, the
determination of spillway capacity of proposed Bengoh dam is conducted by
analyzing the design flood to produce the outflow hydrograph for the spillway. The
determination of spillway capacity is very important in designing spillway structure.
Sufficient design of spillway can avoid dam overtopping which may lead to
destruction of the dam that can affect the environment and injury to human
downstream of the dam. |
---|