SUPPLY CHAIN AND LOGISTICS: A KEY TO EXECUTING INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA
Industrialised building system (IBS) has become a priority in modern construction methods, enhancing building components ’ quality, speeding up completion time , and reducing construction costs. The building components are manufactured off-site and later assembled on the project site....
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
i-CATS University College Publication
2024
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/47146/1/%5B3a%5D%20Paper%20Published%20to%20MJS.pdf http://ir.unimas.my/id/eprint/47146/ https://sites.google.com/icats.edu.my/mjs/home?authuser=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.unimas.ir-47146 |
---|---|
record_format |
eprints |
spelling |
my.unimas.ir-471462024-12-31T05:10:53Z http://ir.unimas.my/id/eprint/47146/ SUPPLY CHAIN AND LOGISTICS: A KEY TO EXECUTING INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA Rohaida, Affandi Abdul Kadir, Marsono Izni Syahrizal, Ibrahim Masine, Md Tap Aliff Ridzuan, Bunawan TH Building construction Industrialised building system (IBS) has become a priority in modern construction methods, enhancing building components ’ quality, speeding up completion time , and reducing construction costs. The building components are manufactured off-site and later assembled on the project site. Therefore, the efficiency of logistics is a crucial element in the supply chain process to ensure the efficient movement of components and information to fulfil demands. This paper discusses how several companies from Japan, the United Kingdom, and Italy successfully improved their process of construction prefabrication components through the adaptation of an efficient and effective supply chain and logistics management concept. Results showed that the lean construction principle was opted for their supply chain and logistics. The element of lean principlse such as just-in -time, kanban, continual improvement (kaizen and last planner), and coordination among both upstream supplier s and downstream customers have initiate d successful improvements in their productivity. These successful concepts can be considered in maximising the full potential of an IBS supply chain and logistics management in the future. i-CATS University College Publication 2024-06 Article PeerReviewed text en http://ir.unimas.my/id/eprint/47146/1/%5B3a%5D%20Paper%20Published%20to%20MJS.pdf Rohaida, Affandi and Abdul Kadir, Marsono and Izni Syahrizal, Ibrahim and Masine, Md Tap and Aliff Ridzuan, Bunawan (2024) SUPPLY CHAIN AND LOGISTICS: A KEY TO EXECUTING INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA. Multidisciplinary Journal of Sustainability, 3 (1). pp. 11-26. ISSN 2976-3614 https://sites.google.com/icats.edu.my/mjs/home?authuser=0 |
institution |
Universiti Malaysia Sarawak |
building |
Centre for Academic Information Services (CAIS) |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Sarawak |
content_source |
UNIMAS Institutional Repository |
url_provider |
http://ir.unimas.my/ |
language |
English |
topic |
TH Building construction |
spellingShingle |
TH Building construction Rohaida, Affandi Abdul Kadir, Marsono Izni Syahrizal, Ibrahim Masine, Md Tap Aliff Ridzuan, Bunawan SUPPLY CHAIN AND LOGISTICS: A KEY TO EXECUTING INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA |
description |
Industrialised building system (IBS) has become a priority in modern construction methods, enhancing building components ’ quality, speeding up completion time , and reducing construction costs. The building components are manufactured off-site and later assembled on
the project site. Therefore, the efficiency of logistics is a crucial element in the supply chain process to ensure the efficient movement of components and information to fulfil demands. This paper discusses how several companies from Japan, the United Kingdom, and Italy
successfully improved their process of construction prefabrication components through the adaptation of an efficient and effective supply chain and logistics management concept. Results showed that the lean construction principle was opted for their supply chain and logistics. The element of lean principlse such as just-in -time, kanban, continual improvement
(kaizen and last planner), and coordination among both upstream supplier s and downstream customers have initiate d successful improvements in their productivity. These successful concepts can be considered in maximising the full potential of an IBS supply chain and logistics management in the future. |
format |
Article |
author |
Rohaida, Affandi Abdul Kadir, Marsono Izni Syahrizal, Ibrahim Masine, Md Tap Aliff Ridzuan, Bunawan |
author_facet |
Rohaida, Affandi Abdul Kadir, Marsono Izni Syahrizal, Ibrahim Masine, Md Tap Aliff Ridzuan, Bunawan |
author_sort |
Rohaida, Affandi |
title |
SUPPLY CHAIN AND LOGISTICS: A KEY TO EXECUTING
INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA |
title_short |
SUPPLY CHAIN AND LOGISTICS: A KEY TO EXECUTING
INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA |
title_full |
SUPPLY CHAIN AND LOGISTICS: A KEY TO EXECUTING
INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA |
title_fullStr |
SUPPLY CHAIN AND LOGISTICS: A KEY TO EXECUTING
INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA |
title_full_unstemmed |
SUPPLY CHAIN AND LOGISTICS: A KEY TO EXECUTING
INDUSTRIALISED BUILDING SYSTEM (IBS) IN MALAYSIA |
title_sort |
supply chain and logistics: a key to executing
industrialised building system (ibs) in malaysia |
publisher |
i-CATS University College Publication |
publishDate |
2024 |
url |
http://ir.unimas.my/id/eprint/47146/1/%5B3a%5D%20Paper%20Published%20to%20MJS.pdf http://ir.unimas.my/id/eprint/47146/ https://sites.google.com/icats.edu.my/mjs/home?authuser=0 |
_version_ |
1821007913930457088 |
score |
13.235796 |