Two-stage Heuristic Method for Primary School Timetabling Problem with Considerations for Combined-classes
This research focuses on a primary school timetabling problem, a small-scale primary school that is located at Pengerang, Johor. In this small-scale primary school six classes have been allotted for standard one to standard six. Most of the primary schools timetable are manually developed, which is...
Saved in:
Main Author: | Tan, See Yan |
---|---|
Format: | Thesis |
Language: | English |
Published: |
Universiti Malaysia Sarawak (UNIMAS)
2019
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/27647/3/Tan%20See%20Yan%20ft.pdf http://ir.unimas.my/id/eprint/27647/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Two-stage Heuristic for Primary School Timetabling Problem with Combined Classes Consideration
by: Sze, San Nah, et al.
Published: (2020) -
Two-stage Heuristic Method for Primary School Timetabling Problem with Considerations for Combined-classes
by: Tan, See Yan
Published: (2019) -
Perceptions, practices and problems of school-based assessment for primary school in Kluang, Johor.
by: Thangamani, Elansegaran, et al.
Published: (2015) -
Enhancing hots using problem-based learning and digital game in the context of Malaysian primary school
by: Liew, Chuang Tong, et al.
Published: (2022) -
The practices of active learning approach in mathematics problem solving among primary school teachers in Kulai
by: Subramaniam, Thamaiyanthi
Published: (2021)