Study on the construction and development path of gymnasiums considering ecological environment restrictions

Under the restriction of ecological and environmental factors, our requirements have improved for the development path of gymnasium construction. According to the previous way to carry out the development path of gymnasium construction will make our construction work encounter a lot of unnecessary t...

Full description

Saved in:
Bibliographic Details
Main Authors: Chen, Xiaming, Zheng, Linhong, Xu, Yueyun
Format: Article
Published: Hindawi Publishing Corporation 2022
Subjects:
Online Access:http://eprints.um.edu.my/41363/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Under the restriction of ecological and environmental factors, our requirements have improved for the development path of gymnasium construction. According to the previous way to carry out the development path of gymnasium construction will make our construction work encounter a lot of unnecessary troubles, so we can improve the success rate of the development path of gymnasium construction under the constraints of the ecological environment by carrying out relevant evasive operations according to the constraints of ecological environment. The topological path and path algorithm used to improve the efficiency of stadium construction and development path under the constraints of ecological environment, TEG algorithm, Q-TEG model, Q-TEG algorithm, Dtra algorithm, TraD algorithm, ResR algorithm, and Q-TED algorithm used in resource reservation plus time slot plus hosting bring the following advantages: (1) we use topological path and path algorithm to explore topological representation methods suitable for development path. The overview provides a theoretical basis for guidance, for forwarding technology scheduling mechanisms and multi-path forwarding mechanisms to provide higher flexibility. (2) We use the TEG algorithm of resource reservation plus time slot plus trusteeship, Q-TEG model, and Q-TEG algorithm under multi-model model can deal with the capacity and link of queue in each stadium construction development path well. It is more convenient to set the packet loss threshold for the propagation experiment tested in the simulation. Better help gymnasium construction and development path transmission is successful. (3) The use of the Dtra algorithm, TraD algorithm, ResR algorithm, and Q-TED algorithm in our stadium construction development path of a good deal of the transmission link structure between each node, so that the transmission efficiency between nodes becomes higher, making our stadium construction development path operation more efficient and convenient.