Defect studies during defect liability period / Muhammad Aliff Imran Suardi
Defect Liability Period (DLP) is essential in every building as the warranty of the building. It is also the period a contractor is liable to make good the defects. Therefore, the aims and purposes of this report was to identify the types of defects in a building and to investigate the problems and...
Saved in:
Main Author: | Suardi, Muhammad Aliff Imran |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2019
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/97699/1/97699.pdf https://ir.uitm.edu.my/id/eprint/97699/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Defect study during defect liability period / Mohd Asrul Hassin
by: Hassin, Mohd Asrul
Published: (2010) -
Defect liability period / Muhamad Zairi Hamdan
by: Hamdan, Muhamad Zairi
Published: (2022) -
Investigation of defects during liability period / Azfar Danial Isyraf Anuaridhuan
by: Anuaridhuan, Azfar Danial Isyraf
Published: (2019) -
Post contract work during defect liability period / Nursyahirah Yusri
by: Yusri, Nursyahirah
Published: (2019) -
The study on problems during defects liability period [DLP] / Rosli Abu Huraya
by: Abu Huraya, Rosli
Published: (2009)