Defect studies during defect liability period / Muhammad Aliff Imran Suardi
Defect Liability Period (DLP) is essential in every building as the warranty of the building. It is also the period a contractor is liable to make good the defects. Therefore, the aims and purposes of this report was to identify the types of defects in a building and to investigate the problems and...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Teknologi MARA, Perak
2019
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/97699/1/97699.pdf https://ir.uitm.edu.my/id/eprint/97699/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Defect Liability Period (DLP) is essential in every building as the warranty of the building. It is also the period a contractor is liable to make good the defects. Therefore, the aims and purposes of this report was to identify the types of defects in a building and to investigate the problems and solutions of every defect in this building. It was conducted at Avisena Women's and Children's Specialist Hospital. This report also will focus on all the works related to how to prevent defects in a building. As a result, the building will mainly be safe from any hazards in the future. In conclusion, DLP was shown to be an important role in a contract to keep a building safe. |
---|