Analysis of development planning of own use gas pipeline from gas compressor stations to gathering stations in X field / Muhammad Ariyon, Muhammad Setriya Ramadhan

Trunkline gas network system from Gas Compressor Station (GCS) B to GS.B-GS.B5 has a total distance of 18 km. The distance of GS.B4-GS.B5 is 9400 m. Gas is the main fuel for engines at gathering stations. A deadlock was found on the GS.B4-GS.B5 pipeline. The solution to this problem is to plan a pip...

Full description

Saved in:
Bibliographic Details
Main Authors: Ariyon, Muhammad, Ramadhan, Muhammad Setriya
Format: Article
Language:English
Published: Universiti Teknologi MARA, Sarawak 2023
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/79835/1/79835.pdf
https://ir.uitm.edu.my/id/eprint/79835/
https://jsst.uitm.edu.my/index.php/jsst
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first