Analysis of development planning of own use gas pipeline from gas compressor stations to gathering stations in X field / Muhammad Ariyon, Muhammad Setriya Ramadhan
Trunkline gas network system from Gas Compressor Station (GCS) B to GS.B-GS.B5 has a total distance of 18 km. The distance of GS.B4-GS.B5 is 9400 m. Gas is the main fuel for engines at gathering stations. A deadlock was found on the GS.B4-GS.B5 pipeline. The solution to this problem is to plan a pip...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universiti Teknologi MARA, Sarawak
2023
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/79835/1/79835.pdf https://ir.uitm.edu.my/id/eprint/79835/ https://jsst.uitm.edu.my/index.php/jsst |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|